The jack up barge,Goliath,loaded with transition pieces for the Walney Offshore windfarm project,off Barrow in Furness,Cumbria,UK,is towed out into the Walney channel by a high powered tug during a torrential rain shower. When finished it will have 102,3.6 MW turbines,giving a total capacity of the Walney project of 367.2 MW,enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy | |